Start with the address. Washington has no single counter for remodeling permits. The building permit is issued by the city, or by the county if you are outside city limits. The electrical permit may come from the same office or from the state. Find out which before you plan anything, because the answer decides who inspects the job.
Building permits: the usual exemption list
Local departments publish their own versions of the residential code's exemption section. Federal Way's is a clear example and cites International Residential Code section R105.2 directly. Under it, no building permit is needed for:
- A one-story detached accessory structure with a floor area of 200 square feet or less
- A fence not over 6 feet high
- A retaining wall not over 4 feet, measured from the bottom of the footing to the top of the wall, unless it supports a surcharge
- Sidewalks and driveways
- Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work
- A prefabricated swimming pool less than 24 inches deep
- A window awning that projects 54 inches or less and needs no extra support
- A deck of 200 square feet or less that is no more than 30 inches above grade at any point, is not attached to the house and does not serve the required exit door
Read the deck line twice. All four conditions have to be met, and the common backyard deck bolted to the house at the kitchen door fails two of them. Compare that with Oregon, where a deck attached to the house is exempt so long as its surface is 30 inches or less above grade. The two states share a river and not a rulebook, and a contractor who works both sides of it should know the difference. Fence height is another: 6 feet here, 7 in Oregon.
Anything structural is outside the list. Moving a wall, adding a room, enlarging a window opening, finishing a basement as living space and building an attached deck all need a permit and plans.
Critical areas change the answer
Federal Way adds a warning that applies in much of western Washington: work in a critical area, including wetlands, streams, landslide hazard areas and their buffers, is not exempt from permits. A shed that would need nothing on a flat suburban lot can need a full review on a lot that backs onto a ravine. If your property has a steep slope or water on or near it, ask the planning desk before you order materials.
Electrical permits
Electrical work in Washington requires a permit and an inspection, and the permit must be bought before the work starts (L&I electrical permits). Some cities run their own electrical permits and inspections, and Tacoma Power's service area is handled by the utility. Everywhere else the Department of Labor & Industries does it, inspecting to the 2023 National Electrical Code.
A homeowner may buy an electrical permit for work they will personally do. An electrical contractor you hire must buy its own permit for its own work on your property. You should not be asked to pull a permit for a contractor's wiring.
The exemptions are narrow and are set out in WAC 296-46B-901. No permit is needed for like-in-kind replacement of up to five snap switches, dimmers, receptacle outlets or thermostats, for replacing one household appliance, or for replacing light fixtures in a single-family home. Add a sixth receptacle to the list, or a new circuit, and you need the permit.
Plumbing and mechanical
The exemptions for these trades on the same Federal Way list are short. Stopping a leak is exempt, but if a concealed pipe has to be replaced the code treats it as new work that needs a permit. Clearing a stoppage and pulling and resetting a toilet are exempt so long as no valves, pipes or fixtures are replaced or rearranged. Portable heating and cooling appliances are exempt on the mechanical side. A new bath fan duct, a relocated drain or a gas line is permit work.
Who should be at the permit counter
Your contractor. L&I's consumer leaflet says so directly, and lists a contractor who asks you to pick up the building permit among the things to be wary of, noting that permits are for your protection because they help ensure the work meets code (L&I F625-084-000). Let the person doing the work carry that responsibility.
Once the permit is issued, the same leaflet's sister page asks you to do one thing during the job: make sure the contractor requests inspections before work is covered up (Hire Smart).
Questions clients ask
Do I need a permit to build a deck in Washington?
Under the residential code exemption that cities such as Federal Way publish, only a deck of 200 square feet or less, no more than 30 inches above grade, not attached to the house and not serving the required exit door is exempt. Most attached decks need a permit. Check with your own city or county.
Can a homeowner do their own electrical work in Washington?
A property owner can buy an electrical permit for work they will personally perform. The permit must be purchased before the work starts and the work is inspected.
Who issues remodeling permits in Washington?
Your city, or the county outside city limits, issues building permits. Electrical permits come from the Department of Labor & Industries unless your city runs its own electrical inspections.
Sources
- City of Federal Way, Washington: Residential permit exemptions (International Residential Code section R105.2)
- Washington State Department of Labor & Industries: Electrical permits, fees and inspections
- Washington Administrative Code 296-46B-901: Electrical permits and inspection, exemptions
- Washington State Department of Labor & Industries: What You Should Know About Hiring a Contractor, Remodeler, or Handyman (F625-084-000)
- Washington State Department of Labor & Industries: Hire Smart step by step